Project

Elevated Toll Road A.P. Pettarani

A.P. Pettarani Elevated Toll Road is built along ± 4.389 m length with Non-Budget Infrastructure Project (PINA) financing scheme and with construction period of 22 months. The width of the main road is 2 X 10.3 m with total pier of 82 piers. The toll road is elevated along Andi Pangeran Pettarani Street which will connect Maros – Sultan Hasanuddin International Airport – Toll Road Section I and II – Andi Pangeran Pettarani Street to Sultan Alaudin Street. The elevated toll road also has off/ on ramp lane in two points which are Boulevard Street and Sultan Alaudin Street with total length of ramp of ±2.467 m, total width of 8 m, and total pier of 54 piers. The Consulting service divides into 4 stages, which are Stage-1: Pre-Construction Services, Stage-2: Design Review, Stage-3: Construction Supervision and Stage-4: Post Construction Services including supervision of outstanding works & final inspection.

Location

Makassar, South Sulawesi, Indonesia

Client

PT Bosowa Marga Nusantara, PT Margautama Nusantara (Mun)

Services

Master Plan, Preliminary Design, Detailed Engineering Design, Construction Supervision

Project Year

1996

Explore Projects

Jababeka Development

Jababeka is a large and comprehensive industrial estate and township located in the province of West Java, Indonesia. The estate is located in the city

Read More »